The
first is the critical review rides technical information on
device-related data integrity, accuracy, compliance (permits, design
documents identify the type test reports, installation informed that the
factory documentation, installation quality records and supporting
documents, etc.) to confirm . And
equipment for physical and data consistency check (on-site installation
of equipment and qualified design drawings and type test compliance
with the manufacture and installation of the licensed device type, the
type and parameters consistent).Second, we must make the installation process supervision. Often
found in the inspection process, manufacturing (mounted) units in the
manufacturing (installation) process, probably because of processing
errors and other reasons, feel free to add filler material, resulting in
a stress concentration where welding or strong enough, potential
problems. Main
connection part (arm, track and safety pressure bar, etc.) are mostly
welded together in the field, and on-site limited by the conditions
difficult to guarantee the quality of welding. Important
parts (sliding type spindle, turn the crank horse, racing steering
shaft, etc.) installed in the field, it is possible to use different
types of steel or welded wire (strip) grades improper selection,
resulting in the course of prone to cracks and other defects. More
subtle and difficult to weld, disassembly, assembly, welding is also
difficult to achieve, weld quality can not be guaranteed.Defects
that may occur on the above, the inspection process to early
intervention, in accordance with the provisions of the construction unit
checking the implementation of the construction process, the
dismantling to be overhauled, require authentication to validate, to
prevent undetected defects.Once
again to urge the relevant units to implement the main responsibility
for the good acceptance testing and registration clearance.Inspection
process also publicize laws and regulations in the process, by
examining the implementation of the production units establish a new
system, the implementation of safety and quality of enterprises the main
responsibility. In
doing document review, playgrounds equipment dismantling and other work to do even
after acceptance testing, improve equipment and technology files. Acceptance after passing inspection, urging the use of units of good equipment registration, issuing inspection marks.In
the implementation of the inspection process, these three aspects are
inseparable, through the grasp every aspect of the inspection, it may be
done to avoid the corresponding construction quality defects, and
ultimately ensure the safety and quality equipment.
Play equipment, is currently in the country, still in the early stages, mainly in the small playground equipment play areas, equipment, single, small number of people to participate, many people are not able to enjoy the fun play equipment. So play equipment market outlook is still very great! To operate amusement equipment, the election Ze venue crucial; course also need to have a good playground equipment supplier.