How to ensure the safety of large-scale amusement facilities

The first is the critical review rides technical information on device-related data integrity, accuracy, compliance (permits, design documents identify the type test reports, installation informed that the factory documentation, installation quality records and supporting documents, etc.) to confirm . And equipment for physical and data consistency check (on-site installation of equipment and qualified design drawings and type test compliance with the manufacture and installation of the licensed device type, the type and parameters consistent).Second, we must make the installation process supervision. Often found in the inspection process, manufacturing (mounted) units in the manufacturing (installation) process, probably because of processing errors and other reasons, feel free to add filler material, resulting in a stress concentration where welding or strong enough, potential problems. Main connection part (arm, track and safety pressure bar, etc.) are mostly welded together in the field, and on-site limited by the conditions difficult to guarantee the quality of welding. Important parts (sliding type spindle, turn the crank horse, racing steering shaft, etc.) installed in the field, it is possible to use different types of steel or welded wire (strip) grades improper selection, resulting in the course of prone to cracks and other defects. More subtle and difficult to weld, disassembly, assembly, welding is also difficult to achieve, weld quality can not be guaranteed.Defects that may occur on the above, the inspection process to early intervention, in accordance with the provisions of the construction unit checking the implementation of the construction process, the dismantling to be overhauled, require authentication to validate, to prevent undetected defects.Once again to urge the relevant units to implement the main responsibility for the good acceptance testing and registration clearance.Inspection process also publicize laws and regulations in the process, by examining the implementation of the production units establish a new system, the implementation of safety and quality of enterprises the main responsibility. In doing document review, playgrounds equipment dismantling and other work to do even after acceptance testing, improve equipment and technology files. Acceptance after passing inspection, urging the use of units of good equipment registration, issuing inspection marks.In the implementation of the inspection process, these three aspects are inseparable, through the grasp every aspect of the inspection, it may be done to avoid the corresponding construction quality defects, and ultimately ensure the safety and quality equipment.
 

没有评论:

发表评论